Project Overview

QPoint Engineering Solutions executed the design, supply, installation and commissioning of a high-efficiency cooling water pumping and UPVC piping system to optimize cooling water flow, reduce energy consumption and improve reliability.

Scope of Work

  • Engineering design
  • Pump supply
  • UPVC piping supply & installation
  • Hydraulic optimization
  • Hydro testing
  • Commissioning
  • Maintenance support

Technical Details

Parameter Details
Pipe Size 8 Inch
Material UPVC
Pipeline Length 250–300 m
Pump Capacity 225 m³/hr
Motor 22 kW
Head 25 m
Drive i5 Integrated VFD

Solution

Designed an optimized piping system, replaced MS piping with UPVC, installed two VFD-controlled pumps, and completed hydro testing and commissioning.

Challenges

Existing MS piping had scaling, causing insufficient flow to equipment and higher energy consumption.

Benefits

  • Energy saving
  • Cost saving
  • Reduced maintenance
  • Fully automatic operation
  • Reduced CO₂ emissions
  • Reliable cooling water flow

Project Highlights

  • 250–300 m pipeline installed
  • 2 pumps installed
  • Completed in 4–5 days
  • Zero safety incidents
  • Successfully commissioned

Before Project

After Project