Cooling Water Process System Upgrade & Monitoring Solution
Location: Talegaon, Maharashtra
Industry: Plastic Moulding
Status: Successfully Commissioned
Project Summary
Q Point Engineering Solutions designed, supplied, fabricated and commissioned a complete cooling water circulation system for a plastic moulding manufacturer. The project converted the existing drainage arrangement into a closed-loop pressurized cooling system using GI piping, storage tanks, cooling towers and a monitoring display system to improve cooling efficiency and reliability.
Project Information
- Application: Cooling Tower to Advanced Process Cooling
- Pump Models: CRE-64 & NB-50
- GI Piping
- 2 Storage Tanks
- 2 Prefabricated Tanks (50 KL)
- 2 Cooling Towers (100 TR)
- Digital Monitoring Display System
Existing Challenges
- Outlet water discharged to drainage
- Water wastage
- Unstable pipeline pressure
- Poor cooling circulation
- No monitoring
Solution Provided
- Fabricated GI pipeline
- Integrated cooling tower and tanks
- Closed-loop pressurized system
- Monitoring display installation
- Testing & commissioning
Client Benefits
- Water conservation
- Stable pipeline pressure
- Improved cooling efficiency
- Reduced operational losses
- Reliable long-term performance
- Real-time monitoring