Cooling Water Pumping & UPVC Piping System Installation
Industry: Electronics Machine Manufacturing
Application: Cooling Tower to Process Cooling System
Project Duration: 4–5 Days
Status: Successfully Commissioned
Project Overview
QPoint Engineering Solutions executed the design, supply, installation and commissioning of a high-efficiency cooling water pumping and UPVC piping system to optimize cooling water flow, reduce energy consumption and improve reliability.
Scope of Work
- Engineering design
- Pump supply
- UPVC piping supply & installation
- Hydraulic optimization
- Hydro testing
- Commissioning
- Maintenance support
Technical Details
| Parameter | Details |
| Pipe Size | 8 Inch |
| Material | UPVC |
| Pipeline Length | 250–300 m |
| Pump Capacity | 225 m³/hr |
| Motor | 22 kW |
| Head | 25 m |
| Drive | i5 Integrated VFD |